Demo dataReference tables carry master rows imported verbatim from EVCSMain.mdb. The work files here are the legacy Dummy Scheme.mdb sample plus synthetic rows prefixed DEMO- and TEST-. Nothing in this app is certified LGED data — see docs/legacy/schema-map.md.
41981-11-0011 — Songchail RHD to Digirpar RHD road via Bangora GC.

97 stations · 0+000.000 → 8+491.000 · total 8491.000 m

Draft
Work ID 🔒41981-11-0011
Road ID419812008
Road nameSongchail RHD to Digirpar RHD road via Bangora GC.
Road type—
ProjectNONE
Division—
District—
Upazila—
PourashavaNONE
Earthwork type1
Construction type1
Scheme FY2001-2002
Rate FY2001-2002
Benchmark (m) 🔒10.000
Paving width (m)3.660000085830688
Shoulder slope0
Wheat %1
Pre-work date2027-08-25
Post-work date—
RemarkTBM Taken on RHd edge line BC top
ApprovedNo
Ignore cutYes

Locked fields are create-only: the work ID names the file and the benchmark is the level datum every future survey hangs on (spec §5, §8).

Chainages

97 stations · 0+000.000 → 8+491.000 · total 8491.000 m

ChainageCH refNextGap (m)Appl. len (m)LastFull gapRemark

Full gap marks a segment with no applied length: the legacy engine stored 0 there, so nothing is worked between this station and the next.

Rendering 97 rows through 0 mounted nodes — the whole ordered set comes from the API because next/applied-length/last/gap are properties of the full list (spec §10).

Computing…

Post-work (achieved earth)

Loading